Mon Nov 12 14:51:44 2018, OH, Tuesday 13 November 00:00 - 08:00 12x
|
00:00 AIDA currently on file R5_38
BRIKEN on file 181112_2321_165Pm_019.dlt (AIDA file at start R5_33)
BigRIPS run 1004
|
Thu Nov 15 06:52:09 2018, OH, Thursday 15th November 16:00 - 24:00 11x
|
15:51 DAQ continues - AIDA file RIBF148/R5_664
165Pm BigRIPS setting + 2.8mm Al degrader
|
Tue Mar 26 14:02:59 2019, OH, Inventory to be shipped back
|
Inventory is currently packaged up under the AIDA desk in B3F
|
Wed Jun 7 00:10:24 2017, NN, TD, Wednesday 7 June 08:00 - 16:00 30x
|
08:12 Analysis of file RIBF128/R6_438 - zero timewarps, four MBS timewarps - see attachment 1
08:23 Online analysis (per DSSSD rates) of R6_443, see attachment 2
|
Thu Jun 8 08:11:39 2017, NN, PV, Thursday 8 June 16:00 - 24:00 (evening shift) 22x
|
16:13 DAQ still running
16:34 BigRIPS and BRIKEN stop their DAQ
|
Sun Jun 4 16:00:49 2017, NN, OH, Monday 5 June 00:00 to 08:00 19x
|
23:59 BigRIPS and Briken stop their DAQ
AIDA run file R2_245
|
Wed May 31 08:00:26 2017, NN, CB, Wednesday 31 May 16:00 - 24:00 15x
|
16:30 Check online data ok (R1_533) see attachment 1
16:39 BigRips and BRIKEN stop their runs
|
Thu Jun 1 16:06:03 2017, NN, Friday 2 June 00:00-08:00 14x
|
00:35 Beam is on
current AIDA file R1_996
|
Thu Dec 14 10:53:27 2023, NH, MP, CC, GA, Snout Removed
|
Snout removed from S4
All detectors removed
|
Thu Dec 7 17:30:36 2023, NH, CC, VP, TD, Thursday 7 December 8x
|
Stack re-assembled - upstream to downstream
|
Fri Dec 8 11:32:44 2023, NH, CC, VP, TD, Friday 8 December 18x
|
Change n+n FEE64 aida04 d8:80:39:41:f6:b7
asic #1 faulty
|
Tue Nov 21 13:56:59 2023, NH, CC, HA, MP, AM, VP, Tuesday 21 November 8x
|
Connect the BB7 on top of the snout to the former aida05 (FEE above aida01)
Also remove copper busbar that is unused
|
Mon Oct 23 10:52:06 2023, NH, CC, AIDA test   
|
Started AIDA at 11:50, writing to disk: file BG18OCT2/R3, stopped around 3 pm
pict1: HV supply
|
Mon Oct 23 14:08:06 2023, NH, CC, AIDA test    
|
Started AIDA at 3:05pm, writing to disk: file BG18OCT2/R4, stopped 18.30
pict1: HV supply
|
Thu Oct 19 10:39:20 2023, NH, Thursday 19 October 10x
|
Water Temp: 20 C - Flow felt on pipe
AIDA interlock OVERRIDE
|
Mon Nov 6 17:30:44 2023, NH, Aida Alpha Analysis   
|
Analysis of tape folder /TapeData/BG18OCT23
Using Go4 https://github.com/cej25/DESPEC_NOV23
|
Wed Nov 22 13:44:36 2023, NH, Report - Cannot change per-ASIC Settings
|
On ASIC settings page trynig to change the settings for one ASIC (e.g. ASIC1 of aida09) seems to cause all 4 ASIC settings to change
1. Ensure act on all FEEs and act on all ASICs unticked
|
Wed Nov 22 14:52:43 2023, NH, AIDA Pulser Calibration   
|
Connect pulser to all p+n FEEs
Turn on pulser, 100 Hz (attachment 3 for settings), rates OK (attachment 1)
|
Thu Nov 23 10:00:16 2023, NH, Report - Cannot change per-ASIC Settings   
|
> On ASIC settings page trynig to change the settings for one ASIC (e.g. ASIC1 of aida09) seems to cause all 4 ASIC settings to change
>
> 1. Ensure act on all FEEs and act on all ASICs unticked
|
Fri Nov 24 10:36:06 2023, NH, Friday 24 November   
|
Pulser LEMOs removed from p+n fees
Pulser connected to n+n fees: aida02 and aida04
BNC PB-5 Polarity --> NEGATIVE
|