Entry  Sun Apr 2 03:32:30 2017, DK, OH, Pulser walkthrough bias_2_a.png
11:32 Pulser walkthrough, 90k down to 10k, 10k steps, 1 min per step
      R26
    
Entry  Sun Jun 5 01:20:39 2016, DK, AE, GL, PJW, Merger wants first SYNC 
Trying to start the AIDA DAQ now that the RI beam is (nearly) ready.  However, we cannot get merging to work.  But the merger status has "Merge
State = GOing     :    paused     :    xfer enabled     :   
want first SYNC"  but the last part ought to show "output paused" or after merge begins, "ready for SYNC".  We restarted
Entry  Sun Jun 12 19:19:22 2016, DK, Machine Time End 
3:13 operators call to tell us the machine time is over.  No more EURICA!
          AIDA62_23 ought to be the last file with legitimate physics data
          We will leave the DAQ running overnight as a b/g run.
Entry  Tue Jul 5 09:39:27 2016, DK, Rly16 is not online usb_serial.JPG
AIDA was relocated, and now I want to power it on to do some tests.  However, I cannot get the Rly16 service running.
Specifically, after powering up the entire AIDA system, on aidas1 PC, I cannot connect to the raspberry pi (nnrpi1) via a web browser
Entry  Tue Jul 5 10:26:11 2016, DK, AIDA relocation pictures 6x
Here are some pictures after AIDA's relocation.
In principle, it can stay here, but probably after the tests we will push it further against the wall.  However, power and ethernet cabling
cannot reach that far.
Entry  Wed Jul 20 18:41:55 2016, DK, AIDA topped up on water 
 I actually topped off the chiller with water tonight as I am returning to Scotland (and then off to CERN) within hours.
I added 4 liters on around July 5th, to move the marker from a little under the halfway mark to over the halfway mark.  After 2.x weeks, it
was still sitting a bit shy of under the halfway mark.  This means that in a humid and hot Japanese month like July, AIDA doesn't evaporate more than
Entry  Tue Nov 8 22:04:21 2016, DK, NP1412 R10 R10_USB1.pngR10_USB2.png
Put the variable Al degraders all back in for safety (was 4.4 mm, now 5.4 mm)

Takechi team switches the condition: F5 empty; F7 CH2; F11 empty

 
Entry  Sun Nov 27 02:46:54 2016, DK, Offline analysis of R18_2 307-312.png2120-2125.png2110-2115.png
Run R18_2: 3 mm Pb, 0.5 mm W (+1 mm Al) and 0.3 mm W (+1 mm Al)

 

 *** data items:  261088000 ( 105923.42 Hz)
Entry  Mon Nov 28 05:38:39 2016, DK, Offline analysis R28_14 r28_14-2120.pngr28_14-2110.pngr28_14-307.png
Conditions: Two Pb walls with empty windows. 3mm Pb degrader between MUSIC 1 and MUSIC 2.

Variable degraders: 1.0 mm W (+1 mm Al) and 0.3 mm W (+1 mm Al)
Entry  Mon Nov 28 06:49:04 2016, DK, Offline analysis R27_1 r27_1-307.pngr27_1-2110.pngr27_1-2120.png
Conditions: One Pb wall with empty windows. 3mm Pb degrader closer to AIDA, on the front of PE wall

Variable degraders: 1.0 mm W (+1 mm Al) and 0.3 mm W (+1 mm Al)
Entry  Thu Dec 1 00:21:08 2016, DK, Offline analysis of R42_7 r42_2110.pngr42_307.pngr42_2120.pngr42-301.pngr42-2000.png
Checking that the implantation is still reasonable after LN2 fill recovery. 

Degrader condition is 8. + 0.2 mm Al on the upstream side of the PE wall.

All three variable degraders are in (0.5 mm W; 0.3 mm W; 1.0 mm W, each on 1 mm Al backing). 
Entry  Thu Dec 1 02:25:41 2016, DK, Offline analysis of R42_32 6x
Offline analysis of AIDA R42_32.

Degrader condition of F11 is with the same stopping power of e.g. R42_7 (see https://elog.ph.ed.ac.uk/AIDA/509).
Entry  Fri Dec 2 06:41:25 2016, DK, Benchmarks for compression 
R45_17 as the test file, which was closed at 9.02 AM Friday, December 2nd at the end of the official parasitic
machine time on Fallon et al.
Entry  Fri Dec 2 09:47:45 2016, DK, F8 targets 
F8 targets, for posterity.

Plastic: 39~40 mm
Entry  Fri Dec 2 09:47:58 2016, DK, F8 targets 
F8 target measurements, for posterity.

Plastic: ~39 to 40 mm
Entry  Fri Dec 2 09:58:54 2016, DK, Simple PID with LISE++ lise-41Al.pngSettingFallonDK.lppPIDintensity.png
I wrote this LISE++ file based on the Takechi .lpp modified by AE for 77Ni, 78Ni, 76Ni.

Basically, I changed the primary beam to 48Ca, reduced the production target thickness to 1 mm (I think it may
Entry  Wed Mar 29 17:49:36 2017, DK, cshrc hacking w/ MIDAS 
The ~/.cshrc was modified to change the MIDAS path for a convenient analysis method, but it should be done in a shell script instead, as it pushes the MIDAS
BASE to all instances 
of MIDAS, such as the Run Control, etc.
Entry  Sun Apr 2 04:40:00 2017, DK, BigRIPS Summary Info 
It is all saved locally file:///homes/npg/Documents/2017Ca/

Although, a little more hacking is required to get the view.html webpage to allow you to click each run
Entry  Tue Jun 6 15:59:19 2017, DK, Wed 7 June night shift 14x
7 June 2017   

00:05  All system-wide checks are passed
Entry  Sat Jun 10 02:40:18 2017, DK, Sat 10 June 8:00 ~ 16:00 R7_1002.txt
10:40    Put lead wall in front of AIDA during beam tuning.

12.30 BNC PB-4 Pulser OFF