AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  AIDA, Page 35 of 46  ELOG logo
  ID Date Authordown Subject Text Attachments
  550   Sun Apr 2 03:32:30 2017 DK, OHPulser walkthrough11:32 Pulser walkthrough, 90k down to 10k,
10k steps, 1 min per step
      R26
 bias_2_a.png 
  275   Sun Jun 5 01:20:39 2016 DK, AE, GL, PJWMerger wants first SYNCTrying to start the AIDA DAQ now that the
RI beam is (nearly) ready.  However,
we cannot get merging to work.  But
  
  312   Sun Jun 12 19:19:22 2016 DKMachine Time End3:13 operators call to tell us the machine
time is over.  No more EURICA!
         
  
  322   Tue Jul 5 09:39:27 2016 DKRly16 is not onlineAIDA was relocated, and now I want to power
it on to do some tests.  However, I
cannot get the Rly16 service running.
 usb_serial.JPG 
  323   Tue Jul 5 10:26:11 2016 DKAIDA relocation picturesHere are some pictures after AIDA's relocation.
In principle, it can stay here, but
probably after the tests we will push it
 6x 
  329   Wed Jul 20 18:41:55 2016 DKAIDA topped up on water I actually topped off the chiller
with water tonight as I am returning to Scotland
(and then off to CERN) within hours.
  
  439   Tue Nov 8 22:04:21 2016 DKNP1412 R10Put the variable Al degraders all back
in for safety (was 4.4 mm, now 5.4 mm)

Takechi team switches the condition:
 R10_USB1.pngR10_USB2.png 
  479   Sun Nov 27 02:46:54 2016 DKOffline analysis of R18_2Run R18_2: 3 mm Pb, 0.5 mm W (+1 mm Al)
and 0.3 mm W (+1 mm Al)

 
 307-312.png2120-2125.png2110-2115.png 
  489   Mon Nov 28 05:38:39 2016 DKOffline analysis R28_14Conditions: Two Pb walls with empty windows.
3mm Pb degrader between MUSIC 1 and MUSIC
2.
 r28_14-2120.pngr28_14-2110.pngr28_14-307.png 
  490   Mon Nov 28 06:49:04 2016 DKOffline analysis R27_1Conditions: One Pb wall with empty windows.
3mm Pb degrader closer to AIDA, on the front
of PE wall
 r27_1-307.pngr27_1-2110.pngr27_1-2120.png 
  509   Thu Dec 1 00:21:08 2016 DKOffline analysis of R42_7Checking that the implantation is still
reasonable after LN2 fill recovery. 

Degrader condition is 8. + 0.2
 r42_2110.pngr42_307.pngr42_2120.pngr42-301.pngr42-2000.png 
  510   Thu Dec 1 02:25:41 2016 DKOffline analysis of R42_32Offline analysis of AIDA R42_32.

Degrader condition of F11 is with the same
 6x 
  515   Fri Dec 2 06:41:25 2016 DKBenchmarks for compressionR45_17 as the test file, which was closed
at 9.02 AM Friday, December 2nd at the end
of the official parasitic
  
  517   Fri Dec 2 09:47:45 2016 DKF8 targetsF8 targets, for posterity.

Plastic: 39~40 mm
  
  518   Fri Dec 2 09:47:58 2016 DKF8 targetsF8 target measurements, for posterity.

Plastic: ~39 to 40 mm
  
  519   Fri Dec 2 09:58:54 2016 DKSimple PID with LISE++I wrote this LISE++ file based on the Takechi
.lpp modified by AE for 77Ni, 78Ni, 76Ni.
 lise-41Al.pngSettingFallonDK.lppPIDintensity.png 
  545   Wed Mar 29 17:49:36 2017 DKcshrc hacking w/ MIDASThe ~/.cshrc was modified to change the MIDAS
path for a convenient analysis method, but
it should be done in a shell script instead,
  
  551   Sun Apr 2 04:40:00 2017 DKBigRIPS Summary InfoIt is all saved locally file:///homes/npg/Documents/2017Ca/

Although, a little more hacking is required
  
  640   Tue Jun 6 15:59:19 2017 DKWed 7 June night shift7 June 2017   

00:05  All system-wide checks are passed
 14x 
  651   Sat Jun 10 02:40:18 2017 DKSat 10 June 8:00 ~ 16:0010:40    Put lead wall in front of AIDA during
beam tuning.
 R7_1002.txt 
ELOG V3.1.3-7933898