| ID |
Date |
Author |
Subject |
Text |
 |
|
550
|
Sun Apr 2 03:32:30 2017 |
DK, OH | Pulser walkthrough | 11:32 Pulser walkthrough, 90k down to 10k,
10k steps, 1 min per step
R26
|
|
|
275
|
Sun Jun 5 01:20:39 2016 |
DK, AE, GL, PJW | Merger wants first SYNC | Trying to start the AIDA DAQ now that the
RI beam is (nearly) ready. However,
we cannot get merging to work. But |
|
|
312
|
Sun Jun 12 19:19:22 2016 |
DK | Machine Time End | 3:13 operators call to tell us the machine
time is over. No more EURICA!
|
|
|
322
|
Tue Jul 5 09:39:27 2016 |
DK | Rly16 is not online | AIDA was relocated, and now I want to power
it on to do some tests. However, I
cannot get the Rly16 service running. |
|
|
323
|
Tue Jul 5 10:26:11 2016 |
DK | AIDA relocation pictures | Here are some pictures after AIDA's relocation.
In principle, it can stay here, but
probably after the tests we will push it |
6x |
|
329
|
Wed Jul 20 18:41:55 2016 |
DK | AIDA topped up on water | I actually topped off the chiller
with water tonight as I am returning to Scotland
(and then off to CERN) within hours. |
|
|
439
|
Tue Nov 8 22:04:21 2016 |
DK | NP1412 R10 | Put the variable Al degraders all back
in for safety (was 4.4 mm, now 5.4 mm)
Takechi team switches the condition: |
 |
|
479
|
Sun Nov 27 02:46:54 2016 |
DK | Offline analysis of R18_2 | Run R18_2: 3 mm Pb, 0.5 mm W (+1 mm Al)
and 0.3 mm W (+1 mm Al)
|
  |
|
489
|
Mon Nov 28 05:38:39 2016 |
DK | Offline analysis R28_14 | Conditions: Two Pb walls with empty windows.
3mm Pb degrader between MUSIC 1 and MUSIC
2.
|
  |
|
490
|
Mon Nov 28 06:49:04 2016 |
DK | Offline analysis R27_1 | Conditions: One Pb wall with empty windows.
3mm Pb degrader closer to AIDA, on the front
of PE wall
|
  |
|
509
|
Thu Dec 1 00:21:08 2016 |
DK | Offline analysis of R42_7 | Checking that the implantation is still
reasonable after LN2 fill recovery.
Degrader condition is 8. + 0.2 |
    |
|
510
|
Thu Dec 1 02:25:41 2016 |
DK | Offline analysis of R42_32 | Offline analysis of AIDA R42_32.
Degrader condition of F11 is with the same |
6x |
|
515
|
Fri Dec 2 06:41:25 2016 |
DK | Benchmarks for compression | R45_17 as the test file, which was closed
at 9.02 AM Friday, December 2nd at the end
of the official parasitic
|
|
|
517
|
Fri Dec 2 09:47:45 2016 |
DK | F8 targets | F8 targets, for posterity.
Plastic: 39~40 mm
|
|
|
518
|
Fri Dec 2 09:47:58 2016 |
DK | F8 targets | F8 target measurements, for posterity.
Plastic: ~39 to 40 mm
|
|
|
519
|
Fri Dec 2 09:58:54 2016 |
DK | Simple PID with LISE++ | I wrote this LISE++ file based on the Takechi
.lpp modified by AE for 77Ni, 78Ni, 76Ni.
|
  |
|
545
|
Wed Mar 29 17:49:36 2017 |
DK | cshrc hacking w/ MIDAS | The ~/.cshrc was modified to change the MIDAS
path for a convenient analysis method, but
it should be done in a shell script instead, |
|
|
551
|
Sun Apr 2 04:40:00 2017 |
DK | BigRIPS Summary Info | It is all saved locally file:///homes/npg/Documents/2017Ca/
Although, a little more hacking is required |
|
|
640
|
Tue Jun 6 15:59:19 2017 |
DK | Wed 7 June night shift | 7 June 2017
00:05 All system-wide checks are passed
|
14x |
|
651
|
Sat Jun 10 02:40:18 2017 |
DK | Sat 10 June 8:00 ~ 16:00 | 10:40 Put lead wall in front of AIDA during
beam tuning.
|
|