AIDA
GELINA
BRIKEN
nToF
CRIB
ISOLDE
CIRCE
nTOFCapture
DESPEC
DTAS
EDI_PSA
179Ta
CARME
StellarModelling
DCF
K40
BRIKEN
Draft saved at 00:00:00
Fields marked with
*
are required
Entry time:
Mon Mar 31 13:11:36 2025
Author
*
:
Subject
*
:
> Some photos of the elements in the last part of the beam line > during Takechi run. > > After the chamber that includes the F11 plastic detector > there are 2 GSI-MUSIC chambers. > > In between the MUSIC chambers there is a sample changer > with 2 Carbon targets of 6mm and 3mm thickness and also > an empty position. > > After the 2nd MUSIC there is a plastic detector for testing > (could be removed at any time) > > Afterwards there is the degrader mounted on a separate table. > In the same table there is a 10cm thick lead wall > to protect AIDA during Takechi run. > > Mounted on the shielding are from the beam side the top and bottom > plastic veto detectors. > > On the back side the Si detector is mounted. > > The hole in the shielding is covered with > a 2cm thick Al plate to protect AIDA during Takechi run. > > Behind AIDA there is a thin plastic detector > to veto the passing through particles.
Encoding
:
HTML
ELCode
plain
Suppress Email notification
Attachment 1:
Drop attachments here...
Draft saved at 00:00:00
ELOG V3.1.4-unknown