AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  BRIKEN  ELOG logo
Message ID: 115     Entry time: Sat Nov 5 16:27:13 2016
Author: Tain,Ale,Jorge,Alvaro 
Subject: 62Ni beam in F11 empty target 
Empty position of the target ladder at F11
(hole is smaller than beam size)

CH2 target at F7 is OUT

DLT 161106_0126_62Ni_F11_empty_001

Start: 01:26
Stop: 01:40

NO ROOT FILE!!

At 01:32:
Rate at F3: 2600 cps
Rate at F11: 850 cps
Rate at BRIKEN: 13 n/s
Rate at VPLT: 3 cps
Rate at VPLB: 0.1 cps
ELOG V3.1.4-unknown