AIDA
GELINA
BRIKEN
nToF
CRIB
ISOLDE
CIRCE
nTOFCapture
DESPEC
DTAS
EDI_PSA
179Ta
CARME
StellarModelling
DCF
K40
BRIKEN
Draft saved at 00:00:00
Fields marked with
*
are required
Entry time:
Wed Nov 9 01:04:35 2016
Author
*
:
Subject
*
:
This is the setup which was used for the Ni runs (from Nov. 8th evening on). Note (Nov. 10th): Alejandro built a U-shaped Pb wall, the degrader inside AIDA was removed and possibly a Al plate was installed. This has to be checked when access is possible again. > Attached is the present setup including all walls, auxiliary detectors, degraders etc. and the Takechi setup. > The lead wall will be removed for measurements (of course...). > Not to scale! Some sizes and distances included. Pictures see Jose's entry ID 110. > > Note the shape of the active area of the DeltaE Silicon detector, see previous entry.
Encoding
:
HTML
ELCode
plain
Suppress Email notification
Resubmit as new entry
Attachment 1:
Setup-161109-Takechi.pdf
Original size: 783x561
Attachment 2:
Drop attachments here...
Draft saved at 00:00:00
ELOG V3.1.4-unknown