AIDA
GELINA
BRIKEN
nToF
CRIB
ISOLDE
CIRCE
nTOFCapture
DESPEC
DTAS
EDI_PSA
179Ta
CARME
StellarModelling
DCF
K40
BRIKEN
Draft saved at 00:00:00
Fields marked with
*
are required
Entry time:
Mon Mar 31 13:14:14 2025
Author
*
:
Subject
*
:
> 11:07 New acquisition is started for tungsten degraders > 1mm W + 1mm Al > 0.5mm W + 1mm Al > 3mm Pb (fixed on the beam) > > 11:14 Online is saved and then cleared > file: 161126_1107_001_1114.root > > Rates: > F11R : 10.5Hz > BRIKEN : 170 Hz > > 11:18 Tungsten degraders are removed. > > 11:20 Beam Off > > 11:30 Beam ON > > OBS: Something happens in between with the beam intensity!!! > Rates: > F11R : 10.5Hz && 4.54 Hz > BRIKEN : 177.7 Hz && 160 Hz > > 11:41 Beam OFF > > 11:55 Acquisition is stopped. Files > 161126_1107_001.dlt (full run) > 161126_1107_001.root (Online from 11:18)
Encoding
:
HTML
ELCode
plain
Suppress Email notification
Attachment 1:
Drop attachments here...
Draft saved at 00:00:00
ELOG V3.1.4-unknown