13:08 Beam is still OFF. Background acquisition is started.
Degrader:
3 mm Pb ONLY!
13:25 Signal cables for clover G7 are connected, now G7 spectra are visible in ONLINE.
13:35 Beam Off!
14:00 Beam ON
15:08 Beam OFF, still problems with beam!
15:11 Beam ON
15:18 Acquisition is stopped. Files
161126_1308_002.dlt to 161126_1308_015.dlt
161126_1308_002.root (online)
Rates:
F11R : 4.2 & 1.0 & 9.3 Hz
BRIKEN : 150 & 12.9 & 160 Hz |