AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  BRIKEN  ELOG logo
Message ID: 177     Entry time: Sat Nov 26 20:50:13 2016
Author: GK, AT&AT 
Subject: run 16-19 
=======    START    =======
Date 2016/11/26
Start time	: 17:21
BRIKEN run	: 016
Daq Conf. File	: 161125Conf_BrikenFull.xlsx
DLT File name	: 161126_1721_016
AIDA run	: R9-24
AIDA start	: 16:35
BigRIPS run	: 40Mg-1009
BigRIPS start	: 
---------------------------
Shifters:  GK, AT&AT
=======    Setup    =======
Central fragment:  41Al
--- Degraders ---
 Fixed: 3mm Pb between Musics 
 Variable: 
1=(0.5mm W+1mm Al), 2=(0.3mm W+1mm Al), 3=(1mm W +1mm Al)
1. OUT
2. IN
3. IN

=======  COMMENTS   =======
High gamma counting is affecting rings 1-4. (gammas in beam!?) 

------  Rates  ------
BRIKEN	:    1.12118e+02 cps
F11R	:    6.26962 cps
Clovers	:    1.72406e+04 cps
VPLT	:    1.82165e+01 cps
VPLB	:    9.08055 cps
AIDAPL	:    7.42954 cps

=========   END   =========
Date 2016/11/26
BRIKEN run	: 019
BRIKEN stop	: 18:04
ROOT online	: 161126_1823_016_019.root
AIDA run	: R9-43
AIDA stop	: 18:12
BigRIPS RUN	: 
Attachment 1: 161126_1823_016_019_Rates.png  18 kB  | Hide | Hide all
161126_1823_016_019_Rates.png
Attachment 2: 161126_1823_016_019_Rings.png  25 kB  | Hide | Hide all
161126_1823_016_019_Rings.png
ELOG V3.1.4-unknown