AIDA
GELINA
BRIKEN
nToF
CRIB
ISOLDE
CIRCE
nTOFCapture
DESPEC
DTAS
EDI_PSA
179Ta
CARME
StellarModelling
DCF
K40
BRIKEN
Draft saved at 00:00:00
Fields marked with
*
are required
Entry time:
Wed Apr 2 14:58:40 2025
Author
*
:
Subject
*
:
> ======= START ======= > Date 2016/11/26 > Start time : 20:05 > BRIKEN run : 020 > Daq Conf. File : 161125Conf_BrikenFull.xlsx > DLT File name : 161126_2004_ > AIDA run : R10-0 > AIDA start : 20:05 > BigRIPS run : 40Mg-1011 > BigRIPS start : 19:30 > > --------------------------- > Shifters: AT&AT, AE, GK > ======= Setup ======= > Central fragment: 41Al > --- Degraders --- > Fixed: 3mm Pb attached to beam hole in BRIKEN PE shielding > Variable: > 1=(0.5mm W+1mm Al), 2=(0.3mm W+1mm Al), 3=(1mm W +1mm Al) > 1. OUT > 2. IN > 3. IN > > ======= COMMENTS ======= > > 2016/11/27 > 02:48 Beam Off for a while. > > 07:15 Two peaks appeared in the syncMonitor for Ribf-AIDA. It was after the refilling of Liquid Ni. Not clear if > the possible sync problem affected the measurements. > > 07:20 Beam OFF > > ------ Rates ------ > BRIKEN : 1.90963e+02 Hz > F11R : 9.75134 Hz > Clovers : 2.03958e+02 Hz > VPLT : 1.87119e+01 Hz > VPLB : 7.76665 Hz > AIDAPL : 1.00896e+01 Hz > > ========= END ========= > Date 2016/11/27 > BRIKEN run : 023 > BRIKEN stop : 06:25 > ROOT online : 161126_2004_020_023.root > AIDA run : R10-211 > AIDA stop : 06:25 > BigRIPS RUN : 1022
Encoding
:
HTML
ELCode
plain
Suppress Email notification
Attachment 1:
Drop attachments here...
Draft saved at 00:00:00
ELOG V3.1.4-unknown