======= START =======
Date 2016/11/27
Start time : 13:53
BRIKEN run : 031
Daq Conf. File : 161125Conf_BrikenFull.xlsx
DLT File name : 161127_1353
AIDA run : R20_0
AIDA start : 13:51
BigRIPS run : 1028
BigRIPS start : 12:32:36
---------------------------
Shifters:
======= Setup =======
Central fragment: 40Mg
--- Degraders ---
Fixed: 3mm Pb attached to beam hole in BRIKEN PE shielding
Variable:
1=(0.5mm W+1mm Al), 2=(0.3mm W+1mm Al), 3=(1mm W +1mm Al)
1. IN
2. IN
3. OUT
======= COMMENTS =======
------ Rates ------
BRIKEN : Hz
F11R : Hz
Clovers : Hz
VPLT : Hz
VPLB :
AIDAPL : Hz
========= END =========
Date 2016/11/26
BRIKEN run : 031
BRIKEN stop : 16:04
ROOT online : 161127_1353_031.root
AIDA run : R20_27
AIDA stop : 16:04
BigRIPS RUN : 1030 |