AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  BRIKEN  ELOG logo
Message ID: 180     Entry time: Sun Nov 27 07:10:29 2016
Author: BRIKEN colaboration 
Subject: Run 31 
=======    START    =======
Date 2016/11/27
Start time	: 13:53
BRIKEN run	: 031
Daq Conf. File	: 161125Conf_BrikenFull.xlsx
DLT File name	: 161127_1353
AIDA run	: R20_0
AIDA start	: 13:51
BigRIPS run	: 1028
BigRIPS start	: 12:32:36
 
---------------------------
Shifters:  
=======    Setup    =======
Central fragment:  40Mg
--- Degraders ---
 Fixed: 3mm Pb attached to beam hole in BRIKEN PE shielding
 Variable: 
1=(0.5mm W+1mm Al), 2=(0.3mm W+1mm Al), 3=(1mm W +1mm Al)
1. IN
2. IN
3. OUT

=======  COMMENTS   =======

------  Rates  ------
BRIKEN	:  Hz
F11R	:  Hz
Clovers	:  Hz
VPLT	:   Hz
VPLB	:   
AIDAPL	:   Hz

=========   END   =========
Date 2016/11/26
BRIKEN run	: 031
BRIKEN stop	: 16:04
ROOT online	: 161127_1353_031.root
AIDA run	: R20_27
AIDA stop	: 16:04
BigRIPS RUN	: 1030
ELOG V3.1.4-unknown