AIDA
GELINA
BRIKEN
nToF
CRIB
ISOLDE
CIRCE
nTOFCapture
DESPEC
DTAS
EDI_PSA
179Ta
CARME
StellarModelling
DCF
K40
BRIKEN
Draft saved at 00:00:00
Fields marked with
*
are required
Entry time:
Mon Mar 31 13:10:51 2025
Author
*
:
Subject
*
:
> ======= START ======= > Date 2016/11/27 > Start time : 16:20 > BRIKEN run : 032 > Daq Conf. File : 161125Conf_BrikenFull.xlsx > DLT File name : 161127_1620 > AIDA run : R21_0 > AIDA start : 16:19 > BigRIPS run : 40Mg-1032 > BigRIPS start : 16:20 > > --------------------------- > Shifters: PV, TD, GK > ======= Setup ======= > Central fragment: 40Mg > --- Degraders --- > Fixed: 1mm Al + 3mm Pb attached to beam hole in BRIKEN PE shielding > Variable: > 1=(0.5mm W+1mm Al), 2=(0.3mm W+1mm Al), 3=(1mm W +1mm Al) > 1. IN > 2. IN > 3. OUT > > ======= COMMENTS ======= > > 2016/11/27 > ~16:10: Beam Off for a while, we entered F11 area and attached 1mm Al degrader to the beam hole in BRIKEN PE > shielding, then start the new run > ~17:00: AIDA merger stopped > > ------ Rates ------ > BRIKEN : Hz > F11R : Hz > Clovers : Hz > VPLT : Hz > VPLB : Hz > AIDAPL : Hz > > ========= END ========= > Date 2016/11/27 > BRIKEN run : 032 > BRIKEN stop : 17:15 > ROOT online : > AIDA run : R21_8 > AIDA stop : 17:04 > BigRIPS RUN : 1032
Encoding
:
HTML
ELCode
plain
Suppress Email notification
Attachment 1:
Drop attachments here...
Draft saved at 00:00:00
ELOG V3.1.4-unknown