AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  BRIKEN  ELOG logo
Message ID: 183     Entry time: Sun Nov 27 11:15:42 2016
Author: PV, GK, AE, TD  
Subject: 40Mg. Run 34 
=======    START    =======
Date 2016/11/27
Start time	: 17:29
BRIKEN run	: 034
Daq Conf. File	: 161125Conf_BrikenFull.xlsx
DLT File name	: 161127_1729
AIDA run	: R22_2
AIDA start	: 17:29
BigRIPS run	: 40Mg-1033
BigRIPS start	: 17:24
 
---------------------------
Shifters:  PV, AE, GK, TD
=======    Setup    =======
Central fragment:  40Mg
--- Degraders ---
 Fixed: 1mm Al + 3mm Pb attached to beam hole in BRIKEN PE shielding
 Variable: 
1=(0.5mm W+1mm Al), 2=(0.3mm W+1mm Al), 3=(1mm W +1mm Al)
1. IN
2. IN
3. OUT

=======  COMMENTS   =======

2016/11/27


------  Rates  ------
BRIKEN	:   Hz
F11R	:   Hz
Clovers	:   Hz
VPLT	:   Hz
VPLB	:   Hz
AIDAPL	:   Hz

=========   END   =========
Date 2016/11/27
BRIKEN run	: 034
BRIKEN stop	: 18:28
ROOT online	: 
AIDA run	: R22_14
AIDA stop	: 
BigRIPS RUN	: 1033
ELOG V3.1.4-unknown