AIDA
GELINA
BRIKEN
nToF
CRIB
ISOLDE
CIRCE
nTOFCapture
DESPEC
DTAS
EDI_PSA
179Ta
CARME
StellarModelling
DCF
K40
BRIKEN
Draft saved at 00:00:00
Fields marked with
*
are required
Entry time:
Mon Mar 31 13:23:17 2025
Author
*
:
Subject
*
:
======= START ======= Date 2016/11/27 Start time : 18:59 BRIKEN run : 035 Daq Conf. File : 161125Conf_BrikenFull.xlsx DLT File name : 161127_1859 AIDA run : R23_0 AIDA start : 19:19 BigRIPS run : 40Mg-1034 BigRIPS start : 18:33 --------------------------- Shifters: PV, AE, GK, TD ======= Setup ======= Central fragment: 40Mg --- Degraders --- Fixed: 1mm Al + 3mm Pb attached to beam hole in BRIKEN PE shielding Variable: 1=(0.5mm W+1mm Al), 2=(0.3mm W+1mm Al), 3=(1mm W +1mm Al) 1. IN 2. IN 3. OUT ======= COMMENTS ======= 2016/11/27 19:19: There is a transient, AIDA DAQ found stopped due the incompleted LN2 filling. ------ Rates ------ BRIKEN : Hz F11R : Hz Clovers : Hz VPLT : Hz VPLB : Hz AIDAPL : Hz ========= END ========= Date 2016/11/27 BRIKEN run : 035 BRIKEN stop : 19:23 ROOT online : AIDA run : R23_4 AIDA stop : 19:19 BigRIPS RUN : 1034
Encoding
:
HTML
ELCode
plain
Suppress Email notification
Attachment 1:
Drop attachments here...
Draft saved at 00:00:00
ELOG V3.1.4-unknown