<pre>
======= START =======
Date 2016/11/28
Start time : 11:12
BRIKEN run : 056
Daq Conf. File : 161128Conf_BrikenFull.xlsx
DLT File name : 161128_1112
AIDA run : R28-0
AIDA start : 11:08
BigRIPS run : 1049
BigRIPS start : 09:15
---------------------------
Shifters: AT GK KD
======= Setup =======
Central fragment: 41Al @F8
--- Degraders ---
Fixed: 3mm Pb between Musics chambers
Included lead shieldings around the beam.
Variable:
1=(0.5mm W+1mm Al), 2=(0.3mm W+1mm Al), 3=(1mm W +1mm Al)
1. OUT
2. IN
3. IN
======= COMMENTS =======
09:13 Clover G7Red Plugged in again.
AIDAPL gain has been increased by SN from 900V to 1000V.
------ Rates ------
BRIKEN : Hz
F11R : Hz
Clovers : Hz
VPLT : Hz
VPLB : Hz
AIDAPL : Hz
========= END =========
Date 2016/11/28
BRIKEN run :
BRIKEN stop :
ROOT online :
AIDA run :
AIDA stop :
BigRIPS RUN : </pre> |