AIDA
GELINA
BRIKEN
nToF
CRIB
ISOLDE
CIRCE
nTOFCapture
DESPEC
DTAS
EDI_PSA
179Ta
CARME
StellarModelling
DCF
K40
BRIKEN
Draft saved at 00:00:00
Fields marked with
*
are required
Entry time:
Thu Mar 23 09:04:38 2017
Author
*
:
Subject
*
:
We remove partially the floor rails of EURICA to proof that it is possible to move BRIKEN + AIDA. See attached photographs of the present status. This will allow eventually to move both detectors by about 1 meter to have a better focus at the implantation position. This movement could be done with a minimum of cable disconnection using the wheels of both support tables.
Encoding
:
HTML
ELCode
plain
Suppress Email notification
Resubmit as new entry
Attachment 1:
Donwstream-EURICA-Rail.jpg
Original size: 1296x972
Attachment 2:
Upstream-EURICA-Rail.jpg
Original size: 1296x972
Attachment 3:
GeneralView.jpg
Original size: 972x1296
Attachment 4:
Drop attachments here...
Draft saved at 00:00:00
ELOG V3.1.4-unknown