AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  BRIKEN  ELOG logo
Message ID: 195     Entry time: Thu Mar 23 09:30:58 2017
Author: JL Tain, J Agramunt, V. Phong, C. Griffin, O. Hall, S. Nishimura 
Subject: Power-up and 1st spectrum 
Crates powered up.
DACQ started.
New directory: /data/1703Preparation/
DACQ configuration file: 170323Conf_BrikenFull.xlsx 
(copied from from 161125Conf_BrikenFull_23.16.xlsx)
Short background run: 170323_1841_Background.root.
Neutron spectrum looks OK (see attached graph)
All the tubes look Ok.
Attachment 1: 170323_1841Background.pdf  37 kB  | Hide | Hide all
170323_1841Background.pdf
ELOG V3.1.4-unknown