AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  BRIKEN  ELOG logo
Message ID: 264     Entry time: Fri Mar 31 21:45:25 2017
Author: YS, LIU, OH, DK 
Subject: 37Na run 50 
Date: 1/04/2017
Start: 05:45
BRIKEN run: 50
AIDA Run: R20_65
BigRIPS run: 202
DLT: 170401_0544_Na37_050.dlt

BRIKEN Rate: 2 cps
F11 Rate: 8 cps

Date: 1/04/2017
Stop: 06:17
BRIKEN run: 50
AIDA Run: R20_72
BigRIPS run: 202

Root file: 

OBSERVATIONS: Beam stopped at around 06:17am (BigRIPS control system crash?).
ELOG V3.1.4-unknown