AIDA
GELINA
BRIKEN
nToF
CRIB
ISOLDE
CIRCE
nTOFCapture
DESPEC
DTAS
EDI_PSA
179Ta
CARME
StellarModelling
DCF
K40
BRIKEN
Draft saved at 00:00:00
Fields marked with
*
are required
Entry time:
Sat Apr 1 21:37:42 2017
Author
*
:
Subject
*
:
Date: 2/04/2017 Start:04:47 BRIKEN run: 71 AIDA Run: R20_410 BigRIPS run: 227 DLT:170402_0447_Na37_071.dlt BRIKEN Rate: 1.6 cps F11 Rate: 8. cps Date: 2/04/2017 Stop: 05:29 BRIKEN run: 71 AIDA Run: R20_420 BigRIPS run: 227 Root file: OBSERVATIONS: The beam with this setting is finished and the BigRIPS team starts calibration runs. The beam will not be delivered to ZDS.
Encoding
:
HTML
ELCode
plain
Suppress Email notification
Resubmit as new entry
Attachment 1:
Drop attachments here...
Draft saved at 00:00:00
ELOG V3.1.4-unknown