AIDA
GELINA
BRIKEN
nToF
CRIB
ISOLDE
CIRCE
nTOFCapture
DESPEC
DTAS
EDI_PSA
179Ta
CARME
StellarModelling
DCF
K40
BRIKEN
Draft saved at 00:00:00
Fields marked with
*
are required
Entry time:
Sat Jul 9 20:44:31 2016
Author
*
:
Subject
*
:
START Assembly and commissioning of BRIKEN neutron detector The hybrid configuration of the BRIKEN neutron detector will be assembled at BF2 for the first time with 140 3He tubes and 2 CLOVER detectors, connected to the Gasific digital data acquisition system and tested with 252Cf sources.
Encoding
:
HTML
ELCode
plain
Suppress Email notification
Resubmit as new entry
Attachment 1:
Drop attachments here...
Draft saved at 00:00:00
ELOG V3.1.4-unknown