We start to check every thing for the coming run
New directory: /data/1710Preparation/
Copy last configuration file of RIBF148 experiment
renamed:171016_Conf_BrikenFull.xlsx
Edinburgh clock parameters:
-Square signal.
-Amplitude: 1 Vpp
-Offset: 0.5V
-FreqCh1=FreqCh2
Status:
-F11 (high/low gain), AIDA_PL, DT_Pulser, Sync_Pulse, He tubes are defined and connected. Preliminary
configuration "171016_Conf_BrikenFull.xlsx" attached.
-YSO & clovers are not connected yet. |