AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  BRIKEN  ELOG logo
Message ID: 330     Entry time: Mon Oct 16 05:52:14 2017
Author: BRIKEN collaboration 
Subject: START preparation 
We start to check every thing for the coming run

New directory: /data/1710Preparation/

Copy last configuration file of RIBF148 experiment
renamed:171016_Conf_BrikenFull.xlsx

Edinburgh clock parameters:
-Square signal.
-Amplitude: 1 Vpp
-Offset: 0.5V
-FreqCh1=FreqCh2

Status:
-F11 (high/low gain), AIDA_PL, DT_Pulser, Sync_Pulse, He tubes are defined and connected. Preliminary
configuration "171016_Conf_BrikenFull.xlsx" attached. 
-YSO & clovers are not connected yet.
Attachment 1: 171016_Conf_BrikenFull.xlsx  109 kB  Uploaded Tue Oct 17 05:06:31 2017
ELOG V3.1.4-unknown