AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  BRIKEN  ELOG logo
Message ID: 336     Entry time: Sat Oct 21 17:05:21 2017
Author: JA,ATD, JLT 
Subject: New DACQ hardware configuration 
Configuration of BRIKEN DACQ hardware:
Detector->VME->ADC->Channel

New configuration:
Ancillaries are moved to crate #2: V2A8 (SIS3316)
YSO is on crate #1: V1A7 (SIS3316)
V2A4 (SIS3302) failed and was replaced wit spare unit (Chan #5 missing)

Ancillaries are reduced to F11 Plastic (Right and Left, Direct and Attenuated)
and AIDA Plastic veto. The 10Hz pulser signal is also fed to this ADC (Dead Time Pulser).

YSO provides 5 signals: xa, xb, ya, yb and dynode.
Each signal is splitted. One branch of xa,xb,ya,yb is amplified
the other goes directly (but it might be eventually attenuated).
 
See attached file
Attachment 1: TubeAncillaryDACQDistribution-October2017.xlsx  61 kB  Uploaded Sun Oct 22 13:24:06 2017
ELOG V3.1.4-unknown