AIDA
GELINA
BRIKEN
nToF
CRIB
ISOLDE
CIRCE
nTOFCapture
DESPEC
DTAS
EDI_PSA
179Ta
CARME
StellarModelling
DCF
K40
BRIKEN
Draft saved at 00:00:00
Fields marked with
*
are required
Entry time:
Mon Mar 31 13:11:21 2025
Author
*
:
Subject
*
:
> 16-Oct-2018 > > - Start DACQ computer: OK! > - Create directory: /data/1810Preparation/ > - Copy last configuration RIBF139 file: 171119_1126_Conf_BrikenFullYSO.xlsx > - Return PB-5 pulser into crate and set parameters > - Star all crates: OK! > - Start DACQ: OK! > - Rename configuration file and edit to eliminate YSO related parameters > New Config file: 181016_Conf_BrikenFull.xlsx > - Start 3He tube HV: power the ethernet hub, power the pixie PC, > edit the hvmon.conf file (only tubes active), run hvmon: OK! > - We realized that current and voltage of VME crate 1 was oscillating. > We pulled out V1A7 (not used) and it became stable: seems that we are at the limit of > power supply: OK! > - We put the 252Cf source in and check gain match: > only (the gain of) three tubes moved slightly since the last run (one year ago)! > He006, He134, He135 -> new calibration: OK! > - We move SIS3820 clock from internal to external frequency: > Setup UK Tektronix clock: 25MHz, square signal, 800mVpp, -400mV offset > Plug in Lupo module (VME1 crate): OK! > > > ISSUE: the current placement of the table supporting the MUSIC chamber > is too close to the VME1 crate and one of the modules (V1A4) > cannot be extracted in case of failure. However V1A7 is unused > in this run and can be used as replacement.
Encoding
:
HTML
ELCode
plain
Suppress Email notification
Attachment 1:
Drop attachments here...
Draft saved at 00:00:00
ELOG V3.1.4-unknown