18/10/18 START: 20:20
18/10/18 STOP: 23:17
** Use of other configuration file:
181016_Conf_BrikenFull_2153_test_thr.xlsx
ROOT file: 181018_2020_252Cf_z15cm_2317.root
DLT:
181018_2020_252Cf_z15cm_025.dlt
181018_2020_252Cf_z15cm_026.dlt
181018_2020_252Cf_z15cm_027.dlt
Comment:
- 252Cf source placed at the center using cardboard piece, z=15cm beam upstream, source axis perpendicular to
the beam axis.
- Clovers OUT of the moderator.
- AIDA not inside the moderator.
- Without In beam PE shielding. |