AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  BRIKEN  ELOG logo
Message ID: 367     Entry time: Thu Oct 18 15:24:40 2018
Author: AT2, JLT, SN 
Subject: 252Cf long measure, z=25cm beam upstream, no clovers 
18/10/18 START: 23:23
18/10/19 STOP: 08:23

** Use of other configuration file: 
181016_Conf_BrikenFull_2153_test_thr.xlsx

ROOT file: 181018_2323_252Cf_z25cm_0823.root
DLT: 
181018_2323_252Cf_z25cm_028.dlt
181018_2323_252Cf_z25cm_029.dlt
181018_2323_252Cf_z25cm_030.dlt
181018_2323_252Cf_z25cm_031.dlt
181018_2323_252Cf_z25cm_032.dlt
181018_2323_252Cf_z25cm_033.dlt
181018_2323_252Cf_z25cm_034.dlt


Comment: 
- 252Cf source placed at the center using cardboard piece, z=25cm beam upstream, source axis perpendicular to
the beam axis.
- Clovers OUT of the moderator. 
- AIDA not inside the moderator.
- Without In beam PE shielding.
ELOG V3.1.4-unknown