18/10/19 START: 18:25
18/10/19 STOP: 19:19
** Configuration file:
181016_Conf_BrikenFull_2153_test_thr.xlsx
ROOT file:
DLT:
181019_1825_252Cf_z0cm_042.dlt
Comment:
- 252Cf source placed at the center using cardboard piece, z=0cm, source axis perpendicular to the beam axis,
rotated 90deg with respect to previous measurements.
- Clovers were placed outside the moderator
- AIDA not inside the moderator.
- Without In beam PE shielding.
** A high dead time has been observed in the online (50%). The system is completely restarted for checking.
***** CHECK DATA, CHANGE OF CONFIGURATION WITHOUT RESTARTING GASIFIC70 |