<p>We observed 6 pm LN2 filling of both clovers on Monday Nov 5th.</p>
<p>D4 went full within reasonable time of below 10 minutes.</p>
<p>Filling of G7 was stopped by "emergency sensor" after about 15 minutes of filling.</p>
<p>Likely the temp sensor at the LN2 overflow pipe of G7 should be changed.</p>
<p>The clock at LN2 fill system is off by about 25 minutes (filling comes later than set at the control unit.)</p>
<p> </p> |