AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  BRIKEN  ELOG logo
Message ID: 52     Entry time: Wed Jul 20 16:12:58 2016
Author: S. Go, ... 
Subject: CLOVER 
Mounting of the CLOVER detectors in position

CLOVER G7: right of beam
CLOVER D4: left of beam

G7 crystals:
Beam ->
Back view: 
Red   Blue
Green Black

D4 crystals:
Beam ->
Front view:
Red Green
Blue Black

Photos of the arrangement with COVER detectors attached
Attachment 1: DSC_2522.JPG  4.435 MB  | Hide | Hide all
DSC_2522.JPG
Attachment 2: DSC_2523.JPG  4.163 MB  Uploaded Wed Jul 20 17:14:06 2016  | Hide | Hide all
DSC_2523.JPG
Attachment 3: DSC_2524.JPG  4.376 MB  Uploaded Wed Jul 20 17:14:44 2016  | Hide | Hide all
DSC_2524.JPG
ELOG V3.1.4-unknown