AIDA
GELINA
BRIKEN
nToF
CRIB
ISOLDE
CIRCE
nTOFCapture
DESPEC
DTAS
EDI_PSA
179Ta
CARME
StellarModelling
DCF
K40
BRIKEN
Draft saved at 00:00:00
Fields marked with
*
are required
Entry time:
Thu Oct 6 02:03:32 2016
Author
*
:
Subject
*
:
We started the assembly of BRIKEN and AIDA detectors in their final position on Tuesday October 4: Gabor Kiss, Phong Vi, Keishi Matsui, Shunji Nishimura, Shigeru Kubono, PA, Chris Griffin, Tom Davinson, Nathan Brewster, Shintaro Go, Daniel Stracener, Ariel Tarifeno, Jorge Agramunt, Alvaro Tolosa, Jose L Tain Tubes were removed from BRIKEN. PE matrix lifted with crane. Table rotated and placed in the final position (front wheels between forward EURICA rails) by hand. Table leveled (height, angle) with the help of laser. PE matrix placed back. AIDA rotated and adjusted to BRIKEN by hand. See photos
Encoding
:
HTML
ELCode
plain
Suppress Email notification
Resubmit as new entry
Attachment 1:
BRIKEN-AIDA.jpg
Original size: 2592x1944
Attachment 2:
BRIKENfront.jpg
Original size: 2592x1944
Attachment 3:
AIDAback.jpg
Original size: 2592x1944
Attachment 4:
AIDAintoBRIKEN.jpg
Original size: 1944x2592
Attachment 5:
AIDAnosefront.jpg
Original size: 2592x1944
Attachment 6:
AIDA-CLOVERhole.jpg
Original size: 2592x1944
Attachment 7:
Drop attachments here...
Draft saved at 00:00:00
ELOG V3.1.4-unknown