AIDA
GELINA
BRIKEN
nToF
CRIB
ISOLDE
CIRCE
nTOFCapture
DESPEC
DTAS
EDI_PSA
179Ta
CARME
StellarModelling
DCF
K40
BRIKEN
Draft saved at 00:00:00
Fields marked with
*
are required
Entry time:
Thu Oct 13 12:58:31 2016
Author
*
:
Subject
*
:
NIM Crate Failure. Lost of CLOVER G7 One of the 2 NIM crates, the one containing the power for CLOVER preamps went kaputt. As a consequence the preamp of CLOVER detector G7 was damaged: G7 was removed
Encoding
:
HTML
ELCode
plain
Suppress Email notification
Resubmit as new entry
Attachment 1:
Drop attachments here...
Draft saved at 00:00:00
ELOG V3.1.4-unknown