AIDA
GELINA
BRIKEN
nToF
CRIB
ISOLDE
CIRCE
nTOFCapture
DESPEC
DTAS
EDI_PSA
179Ta
CARME
StellarModelling
DCF
K40
BRIKEN
Draft saved at 00:00:00
Fields marked with
*
are required
Entry time:
Mon Mar 31 13:09:00 2025
Author
*
:
Subject
*
:
> Change of main power line for MPOD and CLOVER preamp > > > Because the incident yesterday with the NIM crate, > we try to separate the CLOVER from the rest of > the equipment. > > So we put the MPOD, which powers the CLOVER but also > the 3He tubes and the VETO detectors, and the preamp > power supply in a different line. > > We check if this has an impact on the noise in either > CLOVER or 3He tubes. > > We measure with the 137Cs-60Co source: > File: 161014_1241_137Cs60Co.root > > After inspecting the spectra we conclude that the impact > is not appreciable. > > See figures > > 662keV resolution: > D4Black: 3.16keV > D4Red: 2.49keV > D4Green: 3.57keV > D4Blue: 3.40keV
Encoding
:
HTML
ELCode
plain
Suppress Email notification
Attachment 1:
Drop attachments here...
Draft saved at 00:00:00
ELOG V3.1.4-unknown