AIDA
GELINA
BRIKEN
nToF
CRIB
ISOLDE
CIRCE
nTOFCapture
DESPEC
DTAS
EDI_PSA
179Ta
CARME
StellarModelling
DCF
K40
BRIKEN
Draft saved at 00:00:00
Fields marked with
*
are required
Entry time:
Mon Mar 31 13:21:56 2025
Author
*
:
Subject
*
:
Friday, October 14, 2016 21:50 AIDA and BRIKEN-CLOVER run with a common clock. After installing the shielding and checking electronics (See next entry) 252Cf source 7.5cm from the center. AIDA nose aligned with the edge of the clovers hole. start: 21:50 run number: BRIKEN:15 AIDA:0 stop : 22:18 run number: BRIKEN:16 AIDA:9 BRIKEN dlt file:252CfWithAida75mmcenter_15 to _16 AIDA file: aidas1:/TapeDate/Sept2016/R41_0 to _9 Online analyzed data around 30% Online spec: 252CfWithAida75mmcenter_15_16.root Configuration file attached.
Encoding
:
HTML
ELCode
plain
Suppress Email notification
Attachment 1:
Drop attachments here...
Draft saved at 00:00:00
ELOG V3.1.4-unknown