Installation of BRIKEN PE shielding for beam related neutrons The missing metallic pieces needed to mount the forward PE shielding finally arrive and we mount it with help of the crane. The shielding (4 PE slabs + 1Cd-PE slab) has attached the support for VETO detectors on the beam side and for and additional ancillary detector a large Si detector on the BRIKEN side. See attached photos. The distance between shielding and BRIKEN is 40 cm.