AIDA
GELINA
BRIKEN
nToF
CRIB
ISOLDE
CIRCE
nTOFCapture
DESPEC
DTAS
EDI_PSA
179Ta
CARME
StellarModelling
DCF
K40
BRIKEN
Draft saved at 00:00:00
Fields marked with
*
are required
Entry time:
Sun Oct 16 12:58:34 2016
Author
*
:
Subject
*
:
Installation of BRIKEN PE shielding for beam related neutrons The missing metallic pieces needed to mount the forward PE shielding finally arrive and we mount it with help of the crane. The shielding (4 PE slabs + 1Cd-PE slab) has attached the support for VETO detectors on the beam side and for and additional ancillary detector a large Si detector on the BRIKEN side. See attached photos. The distance between shielding and BRIKEN is 40 cm.
Encoding
:
HTML
ELCode
plain
Suppress Email notification
Resubmit as new entry
Attachment 1:
Shielding-BRIKEN-AIDA.jpg
Original size: 2592x1944
Attachment 2:
Shielding-BRIKEN.jpg
Original size: 1944x2592
Attachment 3:
ShieldingPlates.jpg
Original size: 1944x2592
Attachment 4:
Drop attachments here...
Draft saved at 00:00:00
ELOG V3.1.4-unknown