> Installation of BRIKEN PE shielding for beam > related neutrons > > The missing metallic pieces needed to mount > the forward PE shielding finally arrive and > we mount it with help of the crane. > > The shielding (4 PE slabs + 1Cd-PE slab) has attached > the support for VETO detectors on the beam side > and for and additional ancillary detector > a large Si detector on the BRIKEN side. > See attached photos. > > The distance between shielding and BRIKEN is 40 cm.