AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  BRIKEN, Page 1 of 21  ELOG logo
ID Dateup Author Subject Text Attachments
  1   Fri Oct 31 09:47:59 2014 Alfredo EstradeBRIKEN elog: Hello world!A elog for the setup of the BRIKEN detector
is now operational at https://elog.ph.ed.ac.uk/BRIKEN/
 
We have setup
  
  2   Fri Oct 31 11:36:57 2014 Alfredo EstradeBRIKEN elog: take 2A elog for the setup of the
BRIKEN detector is now operational at 
  
  3   Fri Oct 31 12:58:49 2014 Robert GrzywaczEntry test - preamps Here is a picture of one of our Mesytec preamplifiers.
We have  located all seven of them. 
They  have 16 input channels and a common
 24.png 
  4   Mon Feb 16 00:29:00 2015 Gabor KISSPolyethyeleneThe polyethelene arrived at RIKEN. Except
4 neighboring holes (located at the inner
ring) the alignment is OK.
 bottom1.JPGsmall2.JPG 
  5   Tue Feb 24 09:34:54 2015 J. Agramunt, H. Baba, A. Estrade[DAQ] DAQ correlation test
We have performed a successful test of the
integration of independent DAQ systems based
 DAQcorrelation_diagram.pdfDAQsoftware.pdfcorrelation_25Hz.pngcorrelation_random.png 
  6   Wed Feb 25 07:38:42 2015 A. Estrade J. Agramunt Usage of synchronization test programsIn order to access to the synchronization
test, we prepare two programs in the PC 
briken1 ( 10.32.6.54).
 15.pngDataRelayFilter_terminal.png 
  7   Sat Apr 25 08:25:42 2015 G. Kiss, J. AgramuntBRIKEN Test setupAltogether 16  tubes are mounted for
the parasitic detector test (see the attached
photos):
 P1120020.JPGP1120023.JPGJap1Cf.pdfUS1Cf.pdf 
  8   Mon Apr 27 04:40:43 2015 G. Kiss, J. Agramuntneutron background at EuricaBased on an about 8h long background measurement,
the neutron background at the Eurica site
was found to be about 0.006 neutron / sec
  
  9   Mon Apr 27 10:18:21 2015 K.Gabor S.Nishimura J.AgramuntORNL 3He tube at RIKEN   photo-3.JPG 
  10   Sat May 2 03:52:14 2015 J.L. Tain3He tube description3He tube drawings and technical details: 
RIKEN, UPC, GSI, ORNL-1, ORNL-2
 He3_GE_30cm.pdfHe3-252248.pdf1inch3He.pdf2inch3He.pdf 
  11   Sat May 2 19:32:08 2015 AEtransfer data AIDA->BRIKENA test program for online data transfer is
available in aidas1 PC at:
  
  12   Sun May 3 09:04:07 2015 J.L. Tain, J. Agramunt, G. KissSummary of neutron measurements
U: (Up: 2 RIKEN tubes at 40cm from AIDA)
D: (Down: 12 RIKEN tubes at 80cm from AIDA)
  
  13   Sun May 3 10:07:25 2015 J.L. Tain, J. Agramunt, G. KissPhotos of new PE shieldingPhotos of the general arrangement and details
of the new PE blocks
 20150502_195020.jpg20150502_194340.jpg20150502_192253.jpg 
  14   Sun May 3 10:10:13 2015 J.L. Tain, J. Agramunt, G. Kiss94Se setting measurement94Se setting:
File: 150503_1500_1554_94Se.root
Rate per tube (n/s): U=0.966, D=0.263, US=0.538
  
  15   Mon May 4 02:26:14 2015 J.Agramunt J.L.Tain K.GaborF11 trigger plugged in Mod2 Ch16 of Briken daq    
  16   Mon May 4 02:36:16 2015 J.Agramunt J.L.Tain K.GaborMaki trigger plugged in Mod2 Ch9    
  17   Mon May 4 03:20:00 2015 Shunji NishimuraRNC New RuleWe have some new rule about the data taken
at RNC from this year. 
Shunji
 kanri_e.pdf 
  18   Mon May 4 04:14:18 2015 J.Agramunt J.L.Tain K.GaborAIDA trigger plugged in Mod2 Ch12AIDA trigger plugged in Mod2 Ch12   
  19   Mon May 4 15:03:47 2015 J.Agramunt J.L.Tain K.Gabor New detector placed under the beam line New detector placed under the beam
line, below MUSIC chamber
This detector replace the USA tubes
 photo_2-2.JPGphoto_1-2.JPGphoto_3-2.JPG 
  20   Tue May 5 02:19:58 2015 j.Agramunt J.L.Tain K.Gabor The Lower polyethylene pieces was swampedThe Lower polyethylene pieces was swamped.
In the photo beam comes from the
left.
 photo-4.JPG 
ELOG V3.1.4-unknown