ID |
Date |
Author |
Subject |
Text |
|
1
|
Fri Oct 31 09:47:59 2014 |
Alfredo Estrade | BRIKEN elog: Hello world! | A elog for the setup of the BRIKEN detector
is now operational at https://elog.ph.ed.ac.uk/BRIKEN/
We have setup |
|
2
|
Fri Oct 31 11:36:57 2014 |
Alfredo Estrade | BRIKEN elog: take 2 | A elog for the setup of the
BRIKEN detector is now operational at |
|
3
|
Fri Oct 31 12:58:49 2014 |
Robert Grzywacz | Entry test - preamps | Here is a picture of one of our Mesytec preamplifiers.
We have located all seven of them.
They have 16 input channels and a common |
|
4
|
Mon Feb 16 00:29:00 2015 |
Gabor KISS | Polyethyelene | The polyethelene arrived at RIKEN. Except
4 neighboring holes (located at the inner
ring) the alignment is OK. |
|
5
|
Tue Feb 24 09:34:54 2015 |
J. Agramunt, H. Baba, A. Estrade | [DAQ] DAQ correlation test |
We have performed a successful test of the
integration of independent DAQ systems based |
|
6
|
Wed Feb 25 07:38:42 2015 |
A. Estrade J. Agramunt | Usage of synchronization test programs | In order to access to the synchronization
test, we prepare two programs in the PC
briken1 ( 10.32.6.54). |
|
7
|
Sat Apr 25 08:25:42 2015 |
G. Kiss, J. Agramunt | BRIKEN Test setup | Altogether 16 tubes are mounted for
the parasitic detector test (see the attached
photos): |
|
8
|
Mon Apr 27 04:40:43 2015 |
G. Kiss, J. Agramunt | neutron background at Eurica | Based on an about 8h long background measurement,
the neutron background at the Eurica site
was found to be about 0.006 neutron / sec |
|
9
|
Mon Apr 27 10:18:21 2015 |
K.Gabor S.Nishimura J.Agramunt | ORNL 3He tube at RIKEN | |
|
10
|
Sat May 2 03:52:14 2015 |
J.L. Tain | 3He tube description | 3He tube drawings and technical details:
RIKEN, UPC, GSI, ORNL-1, ORNL-2 |
|
11
|
Sat May 2 19:32:08 2015 |
AE | transfer data AIDA->BRIKEN | A test program for online data transfer is
available in aidas1 PC at:
|
|
12
|
Sun May 3 09:04:07 2015 |
J.L. Tain, J. Agramunt, G. Kiss | Summary of neutron measurements |
U: (Up: 2 RIKEN tubes at 40cm from AIDA)
D: (Down: 12 RIKEN tubes at 80cm from AIDA)
|
|
13
|
Sun May 3 10:07:25 2015 |
J.L. Tain, J. Agramunt, G. Kiss | Photos of new PE shielding | Photos of the general arrangement and details
of the new PE blocks |
|
14
|
Sun May 3 10:10:13 2015 |
J.L. Tain, J. Agramunt, G. Kiss | 94Se setting measurement | 94Se setting:
File: 150503_1500_1554_94Se.root
Rate per tube (n/s): U=0.966, D=0.263, US=0.538
|
|
15
|
Mon May 4 02:26:14 2015 |
J.Agramunt J.L.Tain K.Gabor | F11 trigger plugged in Mod2 Ch16 of Briken daq | |
|
16
|
Mon May 4 02:36:16 2015 |
J.Agramunt J.L.Tain K.Gabor | Maki trigger plugged in Mod2 Ch9 | |
|
17
|
Mon May 4 03:20:00 2015 |
Shunji Nishimura | RNC New Rule | We have some new rule about the data taken
at RNC from this year.
Shunji |
|
18
|
Mon May 4 04:14:18 2015 |
J.Agramunt J.L.Tain K.Gabor | AIDA trigger plugged in Mod2 Ch12 | AIDA trigger plugged in Mod2 Ch12 |
|
19
|
Mon May 4 15:03:47 2015 |
J.Agramunt J.L.Tain K.Gabor | New detector placed under the beam line | New detector placed under the beam
line, below MUSIC chamber
This detector replace the USA tubes |
|
20
|
Tue May 5 02:19:58 2015 |
j.Agramunt J.L.Tain K.Gabor | The Lower polyethylene pieces was swamped | The Lower polyethylene pieces was swamped.
In the photo beam comes from the
left. |
|