Entry  Wed May 6 04:57:24 2015, J.L. Tain, J. Agramunt, G. Kiss, New degrader thickness 
The Al degrader thickness was reduced to 4.8mm
Entry  Tue May 5 05:29:26 2015, J.L. Tain, J. Agramunt, G. Kiss, Ambient background measurement 
Beam still down. New background measurement
with new RIKEN tube below the MUSIC chamber 
(call it B)
Entry  Tue May 5 05:17:36 2015, J.L. Tain, J. Agramunt, G. Kiss, Ambient background measurement 


Failure of a quadrupole triplet at BigRIPS (some time after earthquake)

We take the chance of measuring background:

File:
150504_1500_2047_bckg.root
Rate per tube (n/s): U=0.098, D=0.0062, US=0.0200
Ratio to 1st 110Zr: U=1.38,  D=1.99,  US=0.90
Notes:
-Compared to the
1st background measurement there are changes
larger than expected statistical fluctuations: 
perhaps due to slight changes in noise
Entry  Tue May 5 05:04:00 2015, J.L. Tain, J. Agramunt, G. Kiss, Change of degrader thickness 
For EURICA measurements degrader thickness were increased
trying to decrease MACI and AIDA trigger rate
Before we had 5.7 mm of Al
Entry  Tue May 5 02:19:58 2015, j.Agramunt J.L.Tain K.Gabor , The Lower polyethylene pieces was swamped photo-4.JPG
The Lower polyethylene pieces was swamped.
In the photo beam comes from the left.
 
Entry  Mon May 4 15:03:47 2015, J.Agramunt J.L.Tain K.Gabor , New detector placed under the beam line photo_2-2.JPGphoto_1-2.JPGphoto_3-2.JPG
 New detector placed under the beam line, below MUSIC chamber
This detector replace the USA tubes in the DACQ because we need the preamp to plug it.
 
Entry  Mon May 4 04:14:18 2015, J.Agramunt J.L.Tain K.Gabor, AIDA trigger plugged in Mod2 Ch12 
AIDA trigger plugged in Mod2 Ch12
Entry  Mon May 4 03:20:00 2015, Shunji Nishimura, RNC New Rule kanri_e.pdf
We have some new rule about the data taken at RNC from this year. 
Shunji
 
Entry  Mon May 4 02:36:16 2015, J.Agramunt J.L.Tain K.Gabor, Maki trigger plugged in Mod2 Ch9 
 
Entry  Mon May 4 02:26:14 2015, J.Agramunt J.L.Tain K.Gabor, F11 trigger plugged in Mod2 Ch16 of Briken daq 
 
Entry  Sun May 3 10:10:13 2015, J.L. Tain, J. Agramunt, G. Kiss, 94Se setting measurement 
94Se setting:
File: 150503_1500_1554_94Se.root
Rate per tube (n/s): U=0.966, D=0.263, US=0.538
Entry  Sun May 3 10:07:25 2015, J.L. Tain, J. Agramunt, G. Kiss, Photos of new PE shielding 20150502_195020.jpg20150502_194340.jpg20150502_192253.jpg
Photos of the general arrangement and details of the new PE blocks
Entry  Sun May 3 09:04:07 2015, J.L. Tain, J. Agramunt, G. Kiss, Summary of neutron measurements  

U: (Up: 2 RIKEN tubes at 40cm from AIDA)
D: (Down: 12 RIKEN tubes at 80cm from AIDA)
Entry  Sat May 2 19:32:08 2015, AE, transfer data AIDA->BRIKEN 
A test program for online data transfer is available in aidas1 PC at:

/homes/npg/aev/AIDAbriken/AIDA-jorge-san.exe
Entry  Sat May 2 03:52:14 2015, J.L. Tain, 3He tube description He3_GE_30cm.pdfHe3-252248.pdf1inch3He.pdf2inch3He.pdf
3He tube drawings and technical details: 
RIKEN, UPC, GSI, ORNL-1, ORNL-2
Entry  Mon Apr 27 10:18:21 2015, K.Gabor S.Nishimura J.Agramunt, ORNL 3He tube at RIKEN photo-3.JPG
 
Entry  Mon Apr 27 04:40:43 2015, G. Kiss, J. Agramunt, neutron background at Eurica 
Based on an about 8h long background measurement, the neutron background at the Eurica site was found to be about 0.006 neutron / sec (in the Riken tubes)
and 0.019 neutron / sec (in the ORNL tubes). The beam was OFF.
Entry  Sat Apr 25 08:25:42 2015, G. Kiss, J. Agramunt, BRIKEN Test setup P1120020.JPGP1120023.JPGJap1Cf.pdfUS1Cf.pdf
Altogether 16  tubes are mounted for the parasitic detector test (see the attached photos):
- two tubes (belonging to RIKEN) are in a 10 cm x 10 cm x 30 cm polyethylene matrix inside Eurica, the distance from AIDA is about 30 cm
- 12 tubes (belonging to RIKEN) are in a 20 xm x 30 xm x 30 cm matrix, outside (below) Eurica, at the closest possible place to AIDA, the distance
Entry  Wed Feb 25 07:38:42 2015, A. Estrade J. Agramunt , Usage of synchronization test programs 15.pngDataRelayFilter_terminal.png
In order to access to the synchronization test, we prepare two programs in the PC  briken1 ( 10.32.6.54).
To Launch the processes, in a terminal type: DataSink -i 3
In other terminal type SynCheck
Entry  Tue Feb 24 09:34:54 2015, J. Agramunt, H. Baba, A. Estrade, [DAQ] DAQ correlation test  DAQcorrelation_diagram.pdfDAQsoftware.pdfcorrelation_25Hz.pngcorrelation_random.png

We have performed a successful test of the integration of independent DAQ systems based on a correlation 
scalar counted from a common clock signal. The principles of the integration method are described in the 
ELOG V3.1.4-unknown