Message ID: 118
Entry time: Tue Oct 12 13:54:21 2021
|
Author: |
RSS TD + OD DR |
Subject: |
CARME opened |
|
|
With the assistance of Oemer and Davide all of the M22 bolts removed from the downstream section of the CARME chamber. To separate the downstream section from the
upstream sections it was necessary to use a lever between M10 bolts screwed into the lift points of adjacent sections of the CARME. The upstream sections were then
lifted from the support frame and placed on the shipment crate base. The open ports of the CARME chamber sections were covered by Al foil.
Attachments 1-3 show downstream section following removal of upstream sections of CARME chamber. Note staining/residue top and bottom right - attachments 2 & 3. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|