AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  CARME  ELOG logo
Message ID: 123     Entry time: Thu Oct 14 15:54:47 2021
Author: TD RSS 
Subject: Thursday 14 October 
Attachment 1 - what is function of the 4x c/s holes indicated?


DSSSD install sequence

1 add 136 - 2x78 way cable harnesses to DSSSD mount via strain relief

2 add DSSSD to mount

3 connect 136 D connector

4 install in CARME chamber 

5 connect 2x78 D connectors and strain relief to 2x78 way D connector 
feedthroughs 

Attachment 2- pins of one of the four feedthroughs were damaged. Needs to be replaced.
Attachment 1: IMG_5056.JPG.jpg  1.879 MB  Uploaded Thu Oct 14 16:55:05 2021  | Hide | Hide all
IMG_5056.JPG.jpg
Attachment 2: IMG_5053.JPG  2.268 MB  Uploaded Fri Oct 15 08:09:34 2021  | Hide | Hide all
IMG_5053.JPG
ELOG V3.1.4-unknown