AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  CARME  ELOG logo
Message ID: 124     Entry time: Fri Oct 15 19:37:12 2021
Author: RSS TD + DR 
Subject: Friday 15 October 

Ring seal is out. See picture 1.

Bellow (towards CARME) was installed in the gas jet chamber. Attached are some pictures.

Attachment 1: IMG_5059.JPG  496 kB  | Hide | Hide all
IMG_5059.JPG
Attachment 2: IMG_5060.JPG  574 kB  Uploaded Fri Oct 15 20:38:32 2021  | Hide | Hide all
IMG_5060.JPG
Attachment 3: IMG_5061.JPG  573 kB  Uploaded Fri Oct 15 20:38:43 2021  | Hide | Hide all
IMG_5061.JPG
Attachment 4: IMG_5062.JPG  562 kB  Uploaded Fri Oct 15 20:39:00 2021  | Hide | Hide all
IMG_5062.JPG
Attachment 5: IMG_5064.JPG  449 kB  Uploaded Fri Oct 15 20:39:12 2021  | Hide | Hide all
IMG_5064.JPG
Attachment 6: IMG_5068.JPG  567 kB  Uploaded Fri Oct 15 20:39:28 2021  | Hide | Hide all
IMG_5068.JPG
Attachment 7: IMG_5071.JPG  372 kB  Uploaded Fri Oct 15 20:39:43 2021  | Hide | Hide all
IMG_5071.JPG
Attachment 8: IMG_5073.JPG  733 kB  Uploaded Fri Oct 15 20:39:56 2021  | Hide | Hide all
IMG_5073.JPG
ELOG V3.1.4-unknown