Looking downstream the RHS motor assembly has loose green/yellow (gnd?) see attachment 1 Install blank base plate to trial install in downstream CARME chamber. The rod is just through all of the mounting holes - see attachments 2 & 3 The rod, plate and block are close fitting. The current position of the TC feedthrough is incompatible wit detector movement- the TC feedthrough should be moved. Detector baseplate with 1x DSSSD installed - attachments 4 - 6, Cabling length looks OK. Should move NEG power and TCs to top & bottom DN40 flanges to avoid conflicts with DSSSDs and cabling.
Encoding
:
HTML
ELCode
plain
Suppress Email notification
Resubmit as new entry
Attachment 1:
20211017_124717.jpg
Original size: 4128x1956
Attachment 2:
20211017_130436.jpg
Original size: 4128x1956
Attachment 3:
20211017_130447.jpg
Original size: 4128x1956
Attachment 4:
20211017_133051.jpg
Original size: 4128x1956
Attachment 5:
20211017_133105.jpg
Original size: 4128x1956
Attachment 6:
20211017_133229.jpg
Original size: 4128x1956
Attachment 7:
IMG_5146.JPG
Original size: 3264x2448
Attachment 8:
IMG_5145.JPG
Original size: 3264x2448
Attachment 9:
IMG_5144.JPG
Original size: 3264x2448
Attachment 10:
IMG_5143.JPG
Original size: 3264x2448
Attachment 11:
IMG_5142.JPG
Original size: 3264x2448
Attachment 12:
IMG_5141.JPG
Original size: 3264x2448
Attachment 13:
IMG_5139.JPG
Original size: 3264x2448
Attachment 14:
IMG_5140.JPG
Original size: 3264x2448
Attachment 15:
Drop attachments here...
Draft saved at 00:00:00
ELOG V3.1.4-unknown