AIDA
GELINA
BRIKEN
nToF
CRIB
ISOLDE
CIRCE
nTOFCapture
DESPEC
DTAS
EDI_PSA
179Ta
CARME
StellarModelling
DCF
K40
CARME
Draft saved at 00:00:00
Fields marked with
*
are required
Entry time:
Fri Apr 4 17:13:55 2025
Author
*
:
Subject
*
:
> Looking downstream the RHS motor assembly has loose green/yellow (gnd?) see attachment 1 > > Install blank base plate to trial install in downstream CARME chamber. The rod is just through all of the mounting holes - see attachments 2 & 3 > > The rod, plate and block are close fitting. > > The current position of the TC feedthrough is incompatible wit detector movement- the TC feedthrough should be moved. > > Detector baseplate with 1x DSSSD installed - attachments 4 - 6, Cabling length looks OK. > > Should move NEG power and TCs to top & bottom DN40 flanges to avoid conflicts with DSSSDs and cabling.
Encoding
:
HTML
ELCode
plain
Suppress Email notification
Attachment 1:
Drop attachments here...
Draft saved at 00:00:00
ELOG V3.1.4-unknown