<p>Kapton cabling and the broken ceramic detector holder have been separated. Required holding jacking plate in a vice and using lots of propanol to wet the jacking screw. A long set of kapton cabling has been removed from the other side of the chamber which can be used when mounting the detectors. The feedthrough flange was re-mounted on that side with no kapton cabling. </p> <p>The wiring for the NEG feedthroughs was in confilct with detectors in previous position. Feedthroughs have been moved to the DN40 flanges at the top and bottom of the chamber section. In order to wire the NEGs to the feedthroughs required rotating the NEGs one position anti-clockwise and re-wiring some of the connections. </p> <p>Left two Getters are connected in series and are connected to the top feedthrough. The two right and the bottom getter are connected in series and are connected to the bottom feedthrough</p>
Encoding
:
HTML
ELCode
plain
Suppress Email notification
Resubmit as new entry
Attachment 1:
Screenshot_20211018-174141_Signal.jpg
Original size: 1080x2400
Attachment 2:
20211018_111130.jpg
Original size: 4000x3000
Attachment 3:
20211018_100015.jpg
Original size: 4000x3000
Attachment 4:
Drop attachments here...
Draft saved at 00:00:00
ELOG V3.1.4-unknown