AIDA
GELINA
BRIKEN
nToF
CRIB
ISOLDE
CIRCE
nTOFCapture
DESPEC
DTAS
EDI_PSA
179Ta
CARME
StellarModelling
DCF
K40
CARME
Draft saved at 00:00:00
Fields marked with
*
are required
Entry time:
Tue Sep 15 08:39:26 2020
Author
*
:
Subject
*
:
Tuesday 15 September 08:40 Rates started working again. Unclear what yesterday evening's bug was caused by. Will investigate eventually. Temperature setpoint reach T=150 , however even at full power (heating constantly on) the RE72 appear unable to reach past T = 135 See attached. Perhaps better insulation would be required. However, this temperature is sufficient to bake CARME with the detectors inserted. Day shift Baking continues and will be left overnight to gather more data. Vessel temperatures are increasing by roughly 1.5 deg/hour with the vessel average temperature now 141.5 deg. Wire seals fully closed and tightened. Bolts were tightened first finger tight, then to 50 N.m and finally to 80 N.m in a pattern so that seal is closed evenly. Leak and pump cart are ready to be connected to the turbo for leak testing tomorrow. 19:20 Baking continues OK. Temperatures seem to increase slowly. See attached.
Encoding
:
HTML
ELCode
plain
Suppress Email notification
Resubmit as new entry
Attachment 1:
20200915_0842_ctrl.png
Original size: 824x1000
Attachment 2:
20200915_0842_temp.png
Original size: 1920x1080
Attachment 3:
20200915_152708.jpg
Original size: 4000x3000
Attachment 4:
image007.jpg
Original size: 815x314
Attachment 5:
20200915_1920_temps.png
Original size: 1920x1080
Attachment 6:
Drop attachments here...
Draft saved at 00:00:00
ELOG V3.1.4-unknown