AIDA
GELINA
BRIKEN
nToF
CRIB
ISOLDE
CIRCE
nTOFCapture
DESPEC
DTAS
EDI_PSA
179Ta
CARME
StellarModelling
DCF
K40
CARME
Draft saved at 00:00:00
Fields marked with
*
are required
Entry time:
Fri Mar 28 20:49:14 2025
Author
*
:
Subject
*
:
> Tuesday 15 September > > 08:40 > Rates started working again. Unclear what yesterday evening's bug was caused by. Will investigate eventually. > Temperature setpoint reach T=150 , however even at full power (heating constantly on) the RE72 appear unable to > reach past T = 135 > See attached. > > Perhaps better insulation would be required. > However, this temperature is sufficient to bake CARME with the detectors inserted. > > > Day shift > Baking continues and will be left overnight to gather more data. Vessel temperatures are increasing by roughly 1.5 deg/hour with the vessel average temperature now 141.5 > deg. > > Wire seals fully closed and tightened. Bolts were tightened first finger tight, then to 50 N.m and finally to 80 N.m in a pattern so that seal is closed evenly. Leak and > pump cart are ready to be connected to the turbo for leak testing tomorrow. > > > 19:20 > Baking continues OK. Temperatures seem to increase slowly. See attached.
Encoding
:
HTML
ELCode
plain
Suppress Email notification
Attachment 1:
Drop attachments here...
Draft saved at 00:00:00
ELOG V3.1.4-unknown