AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  CARME  ELOG logo
Message ID: 133     Entry time: Sun Oct 31 07:21:09 2021
Author: CB JM RSS 
Subject: Detectors arrived in GSI 

(Tue 26 October)

Two new CARME DSSD arrived in GSI and collected. Visually inspected both sides. No obvious damage. Photos attached. Second detector (3335-2) was shipped in upside-down box. Does not seem to have made any difference.

3335-13 will be mounted on bottom of plate. 3335-2 will be mounted on top of plate.

 

Attachment 1: 20211026_144342.jpg  2.177 MB  | Hide | Hide all
20211026_144342.jpg
Attachment 2: 20211026_144656.jpg  2.228 MB  | Hide | Hide all
20211026_144656.jpg
Attachment 3: 20211026_145204.jpg  2.057 MB  | Hide | Hide all
20211026_145204.jpg
Attachment 4: 20211026_145206.jpg  1.989 MB  | Hide | Hide all
20211026_145206.jpg
Attachment 5: 20211026_150432.jpg  3.310 MB  | Hide | Hide all
20211026_150432.jpg
Attachment 6: 20211026_150727.jpg  3.166 MB  | Hide | Hide all
20211026_150727.jpg
ELOG V3.1.4-unknown