AIDA
GELINA
BRIKEN
nToF
CRIB
ISOLDE
CIRCE
nTOFCapture
DESPEC
DTAS
EDI_PSA
179Ta
CARME
StellarModelling
DCF
K40
CARME
Draft saved at 00:00:00
Fields marked with
*
are required
Entry time:
Fri Apr 4 17:18:31 2025
Author
*
:
Subject
*
:
<p>Upper part of the frame was mounted. In order to do so, the valve was closed, turbo wire and hose were disconnected and then connected. Valve was opened again. See pictures 1-2.</p> <p>Bottom part of the tent was constructed with 3 heaters (from one of the controllers) at the front, 4 in the middle, and 4 at the back (4+4 from the other controller). See pictures 3.</p> <p>Thermocouples were tested and connected to TC08 modules.</p> <p>Wire connecting to four heaters was damaged which caused a spark and sound when the upper tent was being constructed. This caused a power failure two times, turning off all three pumps. The upper valve was immediately closed. Power supplies of heaters were disconnected and pumps were turned on again. Valve was opened again as well.</p> <p>Construction of tent is paused. Waiting for the wire to be repaired by tomorrow and start again.</p>
Encoding
:
HTML
ELCode
plain
Suppress Email notification
Attachment 1:
Drop attachments here...
Draft saved at 00:00:00
ELOG V3.1.4-unknown