AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  CARME  ELOG logo
Message ID: 147     Entry time: Wed Nov 10 14:41:12 2021
Author: TD RSS + CB (remotely) 
Subject: Wrapping CARME in heating tape 
ML reports that baking of the upstream section (gas jet interaction chamber plus e-target) has commenced - initially to 50 deg C to check thermocouples. If OK baking 
temperature will be ramped slowly (which I think means c. 10 deg C per h) to limits established for specific components by the e-target.

Ragan and Oemer are currently threading a 10m heating tape helically around the CARME chamber.

16.20 ML reports baking of upstream section is proceeding OK - currently ramping to 100 deg C at 10 deg C / h.

16.25 RSS reports that he completed the install of the thermocouples this morning and will update the Elog with specific locations of each thermocuple and TC08 channel 
later today.

16:30 All CARME thermocouples <20 C. No temperature changes. Monitor.x left under screen. Please summon with screen -x and dismiss with CTRL+a d

17:40 One CARME thermocouple at 40C (CARME front)
ELOG V3.1.4-unknown